內 容
|
一、施工說明:建國校區智耕樓老師研究間及實驗室進行消防感知器檢測作業。
二、施工日期:115年9月7至115年9月13日。
三、施工時間:每日上午08:00至下午17:00。
四、施工地點:建國校區智耕樓1-5樓老師研究室及實驗室。
五、注意事項:
1.檢修期間消防警報燈會出現閃爍狀態,請勿驚慌。
2.進入老師研究間執行檢測消防感知器時間1間不到1分鐘,檢測時間短暫懇請老師敬請配合研究室開啟或本組代理開啟以利盡速完成。
3.以上消防設備委請「協桐消防工程有限公司」實施檢測,施工過程會請廠商穿著工作背心以利識別,感恩大家配合。
4.施工期間營繕組人員為防止物品遺失或破壞將陪同廠商檢測人員進入研究室檢測,造成不便之處,敬請見諒。
六、如有特殊情況(活動、會議或考試)可提出時間及地點,可請廠商避開該時段,連絡方式請撥營繕組分機22358吳榮源先生。造成不便之處,敬請見諒!
**Announcement Regarding Fire Detector Inspection at the Zhizheng Building, Jianguo Campus**
**I. Construction Description:**
The inspection of fire detectors in the faculty research rooms and laboratories at the Zhizheng Building, Jianguo Campus, will be carried out.
**II. Construction Period:**
From September 7, 2026, to September 13, 2026.
**III. Construction Hours:**
Daily from 08:00 AM to 05:00 PM.
**IV. Construction Location:**
Faculty research rooms and laboratories on floors 1 to 5 of the Zhizheng Building, Jianguo Campus.
**V. Precautions:**
1. During the inspection period, the fire alarm lights may flash. Please remain calm and do not panic.
2. The inspection of fire detectors in each faculty research room will take less than one minute. The process is brief, and we kindly request that faculty members cooperate by opening their research rooms or allowing our staff to open them on their behalf to facilitate the timely completion of the inspection.
3. The above fire safety equipment inspection has been entrusted to "Xie Tong Fire Protection Engineering Co., Ltd." During the construction process, the company is staff will wear work vests for easy identification. We sincerely appreciate everyone is cooperation.
4. During the construction period, staff from the Construction and Maintenance Division will accompany the inspection personnel to prevent the loss or damage of items. We apologize for any inconvenience caused.
**VI. Special Circumstances:**
If there are any special circumstances (such as events, meetings, or examinations), please submit the specific time and location so that the inspection can be scheduled to avoid those periods. For inquiries or arrangements, please contact Mr. Wu Rongyuan at extension 22358 of the Construction and Maintenance Division. We apologize for any inconvenience caused.
Warm regards,
Construction and Maintenance Group |
|